Technical Publications


SES considers itself, first and foremost, a research and development company. Not only does SES conduct its own R&D, it also uses the software and offers its consulting services in the marketplace to tackle challenging and complex problems. This unique combination allows SES to develop state-of-the-art software. SES's scientific publications, in the most reputable journals, are an excellent indication of how SES is viewed in the scientific community. For more than 45 years now, SES has been and continues to be the undisputed worldwide leader and pioneer in the field of grounding (earthing), electromagnetic interference and lightning.

The peer-reviewed articles presented hereafter are available for SES’s software licensees only and are not for general distribution. However, the articles can be found in most libraries. If you are unable to locate these articles or if you require more information, please do not hesitate to contact us. Project reports, on the other hand, are strictly confidential. Therefore, they cannot be shared.


# Report Date
333 Antenna Farm Interference Study
R. Southey, F. Dawalibi
"Part 2 Interim Report – Horizontal Circuit Modelling – Engineering Analysis and Consulting Services re. HV Transmission Line Interference with Short Wave Radio Antenna Farm". SES report prepared for Florida Power & Light Company, February 15, 2023.
2023/02/15
332 Antenna Farm Interference Study
R. Southey, F. Dawalibi
"Preliminary Letter Report – Engineering Analysis and Consulting Services re. HV Transmission Line Interference with Short Wave Radio Antenna Farm". SES report prepared for Florida Power & Light Company, December 26, 2022.
2022/12/26
331 Heater Cable Sensitivity Analysis: Apparent Impedance and Leakage Current Density
F. Dawalibi, Y. Li, R. Southey
SES report prepared for Shell International (Houston, Texas), September 6, 2021.
2021/09/06
330 Computer Modeling of ARTAZN LifeRibbonTM for Mitigation of Pipeline AC Interference
R. Southey, F. Dawalibi, S. Fortin, M. Nazari, M. Goldshayan
SES report prepared for ARTAZN LLC (Greeneville, Tennessee), April 12, 2021.
2021/04/12
329 HVDC Transition Station Grounding Study Final Report
R. Southey, F. Dawalibi, S. Franiatte, S. Chabane
Lightning and fault transient analysis associated with underground river crossing of HVDC transmission line and associated transition stations. Client confidential.
2020/12/21
328 Arcadis Project: Computer Simulations for YRE
R. Southey, M. Daigle, M. Nazari
Preliminary study of signal wire interference from AC traction system.
2020/12/11
327 Eversource Substation Lightning Interference Study - Phase 2
F. Dawalibi, Y. Li
SES report prepared for Eversource Berlin Corporate Headquarters, January 2020.
2020/01/15
326 Riel Converter Station Grounding System Field Testing
R. Southey, F. Dawalibi, S. Chabane, M. Joyal, M. Yu
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), November 2019.
2019/11/30
325 Keewatinohk Converter Station - As-Built Grid Performance
R. Southey, F. Dawalibi, S. Chabane, M. Joyal, M. Yu
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), November 2019.
2019/11/22
324 Keewatinohk Converter Station Grounding System Testing
R. Southey, F. Dawalibi, S. Chabane, M. Joyal, M. Yu
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), October 2019.
2019/10/09
323 Review of Atlantic Coast Pipeline AC Interference Mitigation Study
R. Southey, C. Voyer
SES report prepared for Duke Energy (Raleigh, North Carolina), August 2019.
2019/08/30
322 Review of AC Interference Mitigation Assessment of PNG Line 99 and Proposed Pipes to New Receiver
R. Southey, S. Lefebvre
SES report prepared for Piedmont Natural Gas (Charlotte, North Carolina), August 2019.
2019/08/20
321 Eversource Substation Lightning Interference Study - Phase 1
F. Dawalibi, Y. Li
SES report prepared for Eversource Berlin Corporate Headquarters, June 2019.
2019/06/18
320 Electrical Shock Safety in MMTP Construction Zone at Riel Converter Station during 500 kV and 230 kV Fault Conditions
R. Southey, M. Joyal
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), May 2019.
2019/05/30
319 Harmonic Voltages Induced in ITC Twisted Wire Pair Telephone Cables by Crocker Wind Farm Collector Cables
R. Southey, S. Lefebvre
SES report prepared for Geronimo Energy (Edina, Minnesota), May 2019.
2019/05/24
318 ATCO Pole Ground Resistance Testing
R. Southey
SES testing procedure prepared for Trans Mountain Corporation (Calgary, Alberta), May 2019.
2019/05/20
317 AEP/ECSL Mottville Hydro – Pigeon River Railroad Induction Mitigation Study
R. Southey, M. Daigle, S. Lefebvre, B. Cetindag
SES report prepared for ECSL (Chicago, Illinois), May 2019.
2019/05/18
316 Review of AC Interference Studies of Impact of Sheridan 69 kV Substation on Trans Mountain Pipelines
F. Dawalibi, R. Southey, S. Lefebvre
SES report prepared for Trans Mountain Corporation (Calgary, Alberta), April 2019.
2019/04/24
315 Review of BC Hydro Direct Arcing Calculations in Evaluation of Safety and Reliability Impacts of Planned Trans Mountain Pipeline on Existing BC Hydro Transmission System
R. Southey
SES report prepared for Trans Mountain Canada Inc. (Calgary, Alberta), March 2019.
2019/03/24
314 Review of Alden – Warinanco - Linden (AWL) 230 KV Overhead Transmission Line Encroachment EMI Study
F. Dawalibi, Y. Li, M. M. Joyal
SES report prepared for Public Service Electric & Gas Company (PSE&G), March 2019.
2019/03/10
313 Review of Construction Tolerances: Required Clearance of ATCO Jasper 6L650, 69 kV Transmission Line Poles from Trans Mountain Canada Pipeline
R. Southey, F. Dawalibi
SES report prepared for Trans Mountain Canada Inc. (Calgary, Alberta), February 2019.
2019/02/20
312 Review of AC Interference Study and Mitigation Design Assessment of PNG 12” Line 439
R. Southey, C. Voyer
SES report prepared for Piedmont Natural Gas (Charlotte, North Carolina), January 2019.
2019/01/20
311 Review of Arcing Concerns Due to ATCO Jasper 6L650, 69 kV Transmission Line on Trans Mountain Canada Pipeline
F. Dawalibi, R. Southey, S. Lefebvre
SES report prepared for Trans Mountain Canada Inc. (Calgary, Alberta), September 2018.
2018/09/30
310 Review of AC Interference Analysis & Mitigation System Design for Cardinal Lateral Pipeline
R. Southey, C. Voyer
SES report prepared for Duke Energy (Raleigh, North Carolina), September 2018.
2018/09/28
309 Review of AEP Karl Road Station Grounding Study
R. Southey
SES report prepared for AEP Ohio Transmission Company, Inc. (New Albany, Ohio), July 2018.
2018/07/24
308 Review of Predictive AC Influence Assessment for T-001A Phase 3 – 12” Interconnect
R. Southey
SES report prepared for Duke Energy (Raleigh, North Carolina), June 2018.
2018/06/15
307 Riel Station Grounding Study - As-Built Grid Performance
F. Dawalibi, R. Southey, J. Liu, M. Joyal, R. El Hani, S. Chabane, M. Nazari
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), May 2018.
2018/05/15
306 Review of Third Party AC Mitigation Study for Trans Mountain Expansion Project
R. Southey
SES report prepared for Kinder Morgan Canada Inc. (Calgary, Alberta), January 2018.
2018/01/15
305 Review of AC Mitigation Study for Trans Mountain Expansion Project Exposure to BC Hydro Transmission Lines
R. Southey
SES report prepared for Kinder Morgan Canada Inc. (Calgary, Alberta), January 23, 2018.
2018/01/23
304 EMI Impact of Hydro One HVAC Lines on Future CN Freight Railway Bypass
F. Dawalibi, M. Mehrabi, Y. Zhang
SES report prepared for Canadian National Railway Company (Montreal, Quebec), December 2017.
2017/12/29
303 Comments on Proposed Solutions for Jasper 69 kV Interconnect Poles in Close Proximity to Trans Mountain Pipelines
R. Southey
SES report prepared for Kinder Morgan Canada Inc. (Calgary, Alberta), December 20, 2017.
2017/12/20
302 Review of AC Interference Studies of Impact of Jasper 69 kV Interconnect on Trans Mountain Pipelines
R. Southey, C. Voyer
SES Report prepared for Kinder Morgan Canada Inc. (Calgary, Alberta), November 20, 2017.
2017/11/20
301 Riel Station Grounding Study - As-Built Grid Performance: Construction Scenario
F. Dawalibi, R. Southey, J. Liu, M. Joyal, R. El Hani, S. Chabane, M. Nazari
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), October 2017.
2017/10/27
300 Etude d'impact d'exploitation de la ligne 315 kV Charland-Fleury sur la ligne de chemin de fer du CN
F. Dawalibi, R. Southey, S. Lefebvre, R. El Hani, O. Ramos, L. Valcarcel
SES report prepared for Canadian National Railway Company (Montreal, Quebec), September 1, 2017.
2017/09/01
299 Los Azufres - Unit 18 Geothermal Plant Ground Grid Design Safety Re-Evaluation Due to Soil Replacement
F. Dawalibi, S. Tee, L. Valcarcel, O. Ramos
SES report prepared for TSK (Gijón, Spain), August 2017.
2017/08/31
298 Dairy Farm Stray Voltage Measurement and Investigation
F. Dawalibi, R. Southey, L. Valcarcel, M. Daigle
SES report prepared for confidential client (Vermont), August 2017.
2017/08/09
297 Duke Energy Florida Eustis Electromagnetic Interference Study, Phase II Report
F. Dawalibi, J. Liu, M. Joyal
SES report prepared for Duke Energy Florida (Lake Mary, Florida), June 2017.
2017/06/14
296 Los Azufres - Unit 18 Geothermal Plant Ground Grid Design
F. Dawalibi, S. Tee, L. Valcarcel, O. Ramos
SES report prepared for TSK (Gijón, Spain), March 2017.
2017/03/10
295 Review of AC Mitigation Modeling Study, Sabal Trail Pipeline, Hunters Creek Lateral
R. Southey, C. Voyer
SES report prepared for Duke Energy Florida (Lake Mary, Florida), December 2, 2016.
2016/12/02
294 Petroleum Pipeline Grounding and Electromagnetic Interference Investigation Study
F. Dawalibi, Y. Li, M. Joyal, A. Aghabarati
SES report prepared for confidential client (Ohio), November 2016.
2016/11/25
293 Review of AC Mitigation Modeling Study, Sabal Trail Pipeline, MP 236.15 to MP 377.88
R. Southey, C. Voyer
SES report prepared for Duke Energy Florida (Lake Mary, Florida), November 7, 2016.
2016/11/07
292 Summary of Results -Warehouse Grounding at Napanee Plant in Winter Soil
R. Southey
SES report prepared for TransCanada Energy Limited (Calgary, Alberta), November 1, 2016.
2017/11/01
291 Review of AC Mitigation Modeling Study, Sabal Trail Pipeline, Citrus County Lateral
R. Southey, C. Voyer
SES report prepared for Duke Energy Florida (Lake Mary, Florida), October 24, 2016.
2016/10/24
290 Russett East GIS Substation Grounding Study: Removal of Counterpoise between Waugh Chapel and Russett East
F. Dawalibi, J. Liu, M. Joyal
SES report prepared for Baltimore Gas & Electric Company (Baltimore, Maryland), October 2016.
2016/10/07
289 Keewatinohk Converter Station Grounding - Ground Rod Length Sensitivity Analysis
R. Southey, M. Mehrabi
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), September 23, 2016.
2016/09/23
288 BC Hydro Mica Generating Station Roof: Touch & Step Voltage Testing
R. Southey
SES report prepared for British Columbia Hydro and Power Authority (Vancouver, British Columbia), September 2, 2016.
2016/09/02
287 Review of AC Interference Analysis & Mitigation System Design Report, Rev. 2, Prepared for UniversalPegasus International – Florida Southeast Connection Pipeline Project, by ARK Engineering & Technical Service, Inc.
R. Southey, C. Voyer
SES report prepared for Duke Energy Florida (Lake Mary, Florida), August 11, 2016.
2016/08/11
286 Bechtel Stonewall Project – Validation Field Measurements
F. Dawalibi, J. Liu, S. Chabane
SES report prepared for Bechtel Power Corporation (Frederick, Maryland), August 9, 2016.
2016/08/09
285 Review of AC Mitigation & Grounding Study Report for Reunion Compressor/Meter Station, Prepared by Allied Corrosion Industries
R. Southey, C. Voyer
SES report prepared for Duke Energy Florida (Lake Mary, Florida), July 8, 2016.
2016/07/08
284 Keewatinohk Converter Station Final Grounding Study
F. Dawalibi, R. Southey, J. Liu, M. Mehrabi, O. Ramos, S. Fortin, P. Zhao, N. Mitskevitch, M. Siahrang, S. Lefebvre
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), July 2016.
2016/07/01
283 Review of AC Mitigation & Grounding Study Report for Hildreth Compressor Station, Prepared by Allied Corrosion Industries
R. Southey, C. Voyer
SES report prepared for Duke Energy Florida (Lake Mary, Florida), June 24, 2016.
2016/06/24
282 BC Hydro Stave Falls Generation Station: Touch & Step Voltage Testing
R. Southey
SES report prepared for British Columbia Hydro and Power Authority (Vancouver, British Columbia), June 9, 2016.
2016/06/09
281 Review of Sabal Trail AC Interference Analysis & Mitigation System Design Report Prepared by Allied Corrosion Industries
R. Southey, C. Voyer
SES report prepared for Duke Energy Florida (Lake Mary, Florida), May 20, 2016.
2016/05/20
280 Keewatinohk Grounding Design Update
R. Southey, M. Mehrabi, O. Ramos
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), May 4, 2016.
2016/05/04
279 Piedmont Natural Gas Pipeline Mitigation Impact on Duke Energy Infrastructure EMI Study
F. Dawalibi, S. Tee
SES report prepared for Mears Group, Inc. (Rosebush, Michigan), April 2016.
2016/04/01
278 Riel Station Grounding Study – Grid Performance in Sub-Base Material
R. Southey, F. Dawalibi, J. Liu
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), March 30, 2016.
2016/03/30
277 EMI Mitigation Design Study for FGT 12” Gandy Blvd. Relocation Project
F. Dawalibi, R. Southey, S. Tee, Y. Li, C. Voyer, M. Joyal, M. Daigle, Z. Luo
SES report prepared for Duke Energy (Lake Mary, Florida), March 20, 2016.
2016/03/20
276 Duke Energy Florida Eustis Electromagnetic Interference Study
F. Dawalibi, J. Liu, S. Touimer, A. Hajiaboli, M. Boisjoli
SES report prepared for Duke Energy Florida (Lake Mary, Florida), March 2016.
2016/03/01
275 Keewatinohk Converter Station Grounding Study – Summary Design Report
R. Southey, M. Mehrabi, O. Ramos
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), January 18, 2016.
2016/01/18
274 Review of AC Interference Analysis & Mitigation System Design Report Prepared for "Florida Gas Transmission 12"‚ St. Petersburg Lateral Relocation Gandy Blvd.," Rev. 1
R. Southey, C. Voyer
SES report prepared for Duke Energy (Lake Mary, Florida), December 18, 2015.
2015/12/18
273 Review of AC Interference Analysis & Mitigation System Design Report Prepared for "Florida Gas Transmission 12" St. Petersburg Lateral Relocation Gandy Blvd."
R. Southey, C. Voyer
SES report prepared for Duke Energy (Lake Mary, Florida), November 2, 2015.
2015/11/02
272 Riel Station Grounding Study - HVDC Areas with Insulating Rock Removed
R. Southey, F. Dawalibi, J. Liu, M. Joyal
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), October 9, 2015.
2015/10/09
271 HGA Gas Yard Grounding Study for Wildcat Point Generation Facility: DC Blocking between Adjacent Grids
R. Southey, F. Dawalibi, J. Liu, M. Boisjoli, M. Joyal
SES report prepared for Hunt, Guillot & Associates, LLC (Ruston, Louisiana), October 1, 2015.
2015/10/01
270 HGA Gas Yard Grounding Study for Wildcat Point Generation Facility: Phase II
R. Southey, F. Dawalibi, S. Tee, M. Boisjoli, M. Joyal
SES report prepared for Hunt, Guillot & Associates, LLC (Ruston, Louisiana), September 4, 2015.
2015/09/04
269 HGA Gas Yard Grounding Study for Wildcat Point Generation Facility
F. Dawalibi, R. Southey, S. Tee, M. Boisjoli, M. Joyal
SES report prepared for Hunt, Guillot & Associates, LLC (Ruston, Louisiana), July 21, 2015.
2015/07/21
268 Keewatinohk Station Preliminary Grounding Study
F. Dawalibi, R. Southey, J. Liu, M. Mehrabi, O. Ramos
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), July 16, 2015.
2015/07/16
267 Riel Station Grounding Study – June 2015 Scenario
F. Dawalibi, R. Southey, J. Liu
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), June 24, 2015.
2015/06/24
266 West Springfield GIS Substation Grounding Study
F. Dawalibi, J. Liu, M. Daigle, Q. Han, M. Joyal
SES report prepared for Eversource Energy (Hartford, Connecticut), May 29, 2015.
2015/05/29
265 Study of Impact of 230 kV Bus Faults at HONI Lennox TS on Grounding Performance of Interconnected Grounding Systems of Napanee GS / HONI Lennox TS / OPG GS
R. Southey
SES report prepared for Kiewit Engineering & Design Co. (Lenexa, Kansas), May 27, 2015.
2015/05/27
264 SES Technologies Report - AltaLink 423L Project
F. Dawalibi
SES report prepared for McLennan Ross LLP (Calgary, Alberta), April 27, 2015.
2015/04/27
263 Wildcat Point Generation Facility, Plant & Switchyard Grounding, Rock Springs Impact, Phase II Study
F. Dawalibi, R. Southey, S. Tee, M. Siahrang
SES report prepared for Sargent & Lundy LLC (Chicago, Illinois), April 21, 2015.
2015/04/21
262 Riel Station May 2014 Grounding Study Scenario
F. Dawalibi, J. Liu
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), March 24, 2015.
2015/03/25
261 Fish Barrier Site EMI and Grounding Mitigation Analysis
F. Dawalibi, R. Southey, N. Mitskevitch, C. Voyer
SES report prepared for Black & Veatch (Overland Park, Kansas), December 22, 2014.
2014/12/22
260 EMI Study for Jackson’s Ferry – Wythe / Progress Park 138 kV Transmission Line Project
R. Southey, M. Daigle, Q. Han, S. Lefebvre, M. Siahrang, C. Voyer
SES report prepared for American Electric Power (Columbus, Ohio), November 28, 2014.
2014/11/28
259 Wildcat Point Generation Facility, Plant & Switchyard Grounding, Rock Springs Impact, Phase I Study
F. Dawalibi, R. Southey, S. Tee, M. Siahrang
SES report prepared for Sargent & Lundy LLC (Chicago, Illinois), November 23, 2014.
2014/11/23
258 EMI Mitigation Cost Estimates for the NorSpan 500 kV Transmission Line Project
F. Dawalibi
SES report prepared for NorSpan (Chesterfield, Missouri), September 30, 2014.
2014/09/30
257 Shield Wire Current and GPR Differential Calculation for Napanee GS / HONI Lennox GS Interconnection
R. Southey
SES report prepared for Kiewit Engineering & Design Co. (Lenexa, Kansas), June 23, 2014.
2014/06/23
256 Review of MESA Products Inc. AC Mitigation Analysis and Design Study: Edith Clarke – Clear Crossing; Clear Crossing – West Shackelford
R. Southey
SES report prepared for Electric Transmission Texas, LLC (Tulsa, Oklahoma), June 23, 2014.
2014/06/24
255 Fault Study for Napanee GS Grounding System Design
R. Southey
SES report prepared for Kiewit Engineering & Design Co. (Lenexa, Kansas), May 1, 2014.
2014/05/01
254 Étude d’impact de l’exploration et exploitation minière à proximité de l’électrode Duncan
F. Dawalibi, S. Fortin, N. Mitskevitch
SES report prepared for Hydro-Quebec (Montreal, Quebec), March 9, 2014.
2014/03/09
253 EMI Study for Jackson's Ferry - Wythe / Progress Park 138 kV Transmission Line Project - Interim Report
R. Southey, S. Lefebvre, M. Siahrang, C. Voyer
SES report prepared for American Electric Power (Columbus, Ohio), February 11, 2014.
2014/02/11
252 EMI Study for ETT Clear Crossing - Dermott 345 kV Transmission Line Project
R. Southey, C. Voyer, M. Siahrang, R. El-Hani, R. Moini, Y. Li
SES report prepared for Electric Transmission Texas, LLC (Tulsa, Oklahoma), February 10, 2014.
2014/02/10
251 Review of Hydro One Safety Evaluation in Cable Tunnel between John TS - Esplanade TS - Copeland MTS
R. Southey, M. Siahrang, C. Voyer
SES report prepared for Hydro One (Toronto, Ontario), December 26, 2013.
2013/12/26
250 HVDC Interference Study
F. Dawalibi, J. Liu, M. Joyal, R. El-Hani
SES report prepared for AltaLink (Calgary, Alberta), November 24, 2013.
2013/11/24
249 Northeast Utilities' Montville 4J Energy Complex Grounding Evaluation and Mitigation Study
F. Dawalibi, S. Tee, Y. Li
SES report prepared for Northeast Utility Service Company (Berlin, Connecticut), August 2013.
2013/08/01
248 Riel Station Drivable Areas Grounding Study
F. Dawalibi, J. Liu, M. Mehrabi, M. Joyal
SES report prepared for Manitoba Hydro (Winnipeg, Manitoba), May 10, 2013.
2013/05/10
247 Review - Cherokee Combined Cycle Plant Grounding Study
R. Southey
SES report prepared for Kiewit Power Engineers Co. (Lenexa, Kansas), May 6, 2013.
2013/05/06
246 Review - Kiewit Marsh Landing Generating Plant Grounding Study
R. Southey
SES report prepared for Kiewit Power Engineers Co. (Lenexa, Kansas), March 9, 2013.
2013/03/09
245 BGE Tipton GIS Substation Grounding Study
F. Dawalibi, L. Valcárcel, Y. Yang, J. Liu, M.-A. Joyal
SES report prepared for Baltimore Gas & Electric Company (Baltimore, MD), September 30, 2013.
2013/09/30
244 BGE Russett East GIS Grounding Study
F. Dawalibi, J. Liu, M.-A. Joyal, L. Valcárcel, Y. Yang
SES report prepared for Baltimore Gas & Electric Company (Baltimore, MD), September 30, 2013.
2013/09/30
243 Constitution GIS Substation Grounding Study
F. Dawalibi, Y. Li, S. Aliouane, and M. Golshayan
SES report prepared for Baltimore Gas & Electric Company (Baltimore, MD), September 20, 2013.
2013/09/20
241 Analysis of Railroad EMI along MBCR/MBTA Railway Tracks and National Grid 23 kV Distribution Lines Shared Corridor: Phase II
F. Dawalibi, Y. Li, A. Hajiaboli and M. Golshayan
SES report prepared for National Grid (Waltham, MA), August 2013.
2013/08/30
242 Grounding Study: AEP Sorenson Substation
F. Dawalibi, R. Southey, Y. Li, C. Voyer
SES report prepared for American Electric Power (Columbus, Ohio), September 5, 2013
2013/09/05
240 East Longmeadow Substation Shielding Analysis Study
F. Dawalibi, Sylvie Lefebvre, S. Tee
SES report prepared for National Grid (Waltham), August, 2013
2013/08/31
239 Meadowbrook Substation Shielding Analysis Study
F. Dawalibi, Stephane Baron, S. Tee
SES report prepared for National Grid (Waltham), August, 2013
2013/08/31
238 Wayne County Plant Fuel Oil Line and H.F. Lee Energy Complex Combined Cycle Grounding and EMI Mitigation Study - Phase II
F. Dawalibi, S. Tee
SES report prepared for Progress Energy (Raleigh, North Carolina), August, 2013
2013/08/31
237 CoSyn FFT Pipeline EMI Study
R. Southey, M. Siahrang
SES report prepared for CoSyn Technology (Edmonton, Alberta), July 23, 2013
2013/07/23
236 AC Interference Study for Maine Power Reliability Project: 345 kV Transmission Line Impact Study - Phase III Mitigation Design
F. Dawalibi, R. Southey, S. Aliouane, A. Hajiaboli, L. Hoi, Y. Li, S. Lefebvre, S. Perez, M. Siahrang, L. Valcarcel, C. Voyer
Vol I - V, SES report prepared for Burns & McDonnell Engineering Company, Inc. (Kansas City, Missouri), March 20 - May 31, 2013
2013/05/31
235 Simple EMI Mitigation Study Illustrating Impact of Modeling Coating Holidays - Tesla to Riley Pipeline Interference Study
R. Southey, M. Siahrang, R. Moini
SES report prepared for Electric Transmission Texas (Austin, Texas), May 23, 2013
2013/05/23
234 Review of MESA Products, Inc. AC mitigation Analysis and Design Study - Tesla to Riley Pipeline Interference Study
R. Southey
SES report prepared for Electric Transmission Texas (Austin, Texas), May 17, 2013
2013/05/17
233 Electromagnetic Interference Analysis of Underground Circulating Water Pipe, Entergy Louisiana, LLC, Ninemile Power Plant, Westwego, Louisiana
F. Dawalibi, R. Southey, M. Siahrang
SES report prepared for Stone & Webster (Charlotte, North Carolina), December 11, 2012
2012/12/11
232 Wayne County Plant Fuel Oil Line EMI Mitigation Study - Phase I
F. Dawalibi, N. Mitskevitch, S. Tee
SES report prepared for Progress Energy (Raleigh, North Carolina), October 5, 2012
2012/10/05
231 Grounding Study for LCRA - Lower Colorado River Authority Ferguson Replacement Project, Horseshoe Bay, Texas, Project A4WK
F. Dawalibi, R. Southey, A. Hajiaboli, L. Hoi, N. Mitskevitch, M. Siahrang
SES report prepared for Fluor Enterprises, Inc. (Aliso Viejo, California), July 30, 2012.
2012/07/30
230 AC Interference Study for Maine Power Reliability Project: 345 kV Transmission Line Impact Study - Phase II Mitigation Design
F. Dawalibi, R. Southey, E. Dawalibi, S. Fortin, L. Hoi, Y. Li, S. Lefebvre, J. Ma, N. Mitskevitch, S. Perez, W. Ruan, M. Siahrang, S. Tee, L. Valcarel, C. Voyer
SES report prepared for Burns & McDonnell Engineering Company, Inc. (Kansas City, Missouri), June 27, 2012.
2012/06/27
229 Exxon Subsea Pipeline Electric Heating System Analysis (Phase II)
F. Dawalibi, Y. Li, S. Fortin
SES report prepared for ExxonMobil, May 2012.
2012/05/25
228 BP Skarv Swivel EMI Interference Study
F. Dawalibi, S. Tee
SES report prepared for BP/Aker Solutions (Lysaker, Norway), May 2012.
2012/05/10
227 Greater Springfield Reliability Project Interference Study - Phase II & III Update
F. Dawalibi, N. Mitskevitch, Y. Li, J. Ma, S. Lefebvre, L. Valcarcel, S. Perez, C. Voyer, S. Aliouane, A. Hajiaboli
SES report prepared for Northeast Utility Service Company,Berlin, Connecticut, March 2012.
2012/03/15
226 LADWP HVDC Sea Electrode Computer Simulation Results
F. Dawalibi, J. Liu
SES report prepared for LADWP/Burns & McDonnell (Brea, California), March 2012.
2012/03/06
225 AC Interference Study for Maine Power Reliability Project: 345 kV Transmission Line Impact Study – Phase I Update
F. Dawalibi, R. Southey, W. Ruan, G. Berlin, S. Fortin, Y. Li, S. Lefebvre, J. Ma, N. Mitskevitch, S. Perez, H. Pinheiro, C. Rios, S. Tee, L. Valcarel, Y. Yang, Z. Luo, C. Cheng
SES report prepared for Burns & McDonnell Engineering Company, Inc. (Kansas City, Missouri), August 19, 2011
2011/08/19
224 WATL - HVDC & HVAC Interference Prototype Study
F. Dawalibi, J. Ma, Y. Yang, L. Hoi
SES report prepared for Altalink (Calgary, Alberta), August 2011
2011/08/03
223 Analysis of Railroad EMI along MBCR/MBTA Railway Tracks and National Grid 23 kV Distribution Lines Shared Corridor
F. Dawalibi, Y. Li, C. Voyer, Y. Yang, L. Valcarcel
SES report prepared for National Grid (Waltham, Massachusetts), June 2011
2011/06/02
222 BGE High Ridge Substation GIS Grounding Design and Substation Test & Analysis
F. Dawalibi, R. Southey, J. Liu, H. Zhao, F. Xu, H. Pinheiro
SES report prepared for Baltimore Gas & Electric Company (Baltimore, Maryland), May 2011
2011/05/11
221 Brayton Point Preliminary Surge Analysis
R. Southey and F. Dawalibi
SES report prepared for Alltec Corp (Canton, North Carolina), May 5, 2011
2011/05/05
220 AC Interference Study for Maine Power Reliability Project: 345 kV Transmission Line Impact Study
F. Dawalibi, R. Southey, W. Ruan, G. Berlin, S. Fortin, Y. Li, S. Lefebvre, J. Ma, N. Mitskevitch, S. Perez, H. Pinheiro, C. Rios, S. Tee, L. Valcarel, Y. Yang, Z. Luo, C. Cheng
SES report prepared for Burns & McDonnell Engineering Company, Inc. (Kansas City, Missouri), February 23, 2011.
2011/02/23
219 Habshan-5 Utilities & Offsites : Lightning Shielding Study
F. Dawalibi, R. Southey, S. Baron
SES report prepared for Hyundai Engineering & Construction Co., Ltd. (Seoul, South Korea), December 23, 2010.
2010/12/23
218 Riel Station Grounding Study
F. Dawalibi, J. Ma, Y. Li, J. Liu, H. Zhao
SES report prepared for Manitoba Hydro, December 2010.
2010/12/01
217 BGE High Ridge Substation GIS Grounding Design and Grounding Field Tests & Analysis
F. Dawalibi, R. Southey, J. Liu, H. Zhao, F. Xu, H. Pinheiro
SES preliminary report prepared for Baltimore Gas & Electric Company, December 2010.
2010/12/01
216 Lake Benton Telephone Lines: Verification of Interference from New 115 kV Transmission Line
J. Ma, R. Southey
SES report prepared for Excel Engineering, Inc. (Minneapolis, Minnesota), November 5, 2010.
2010/11/05
215 AC Interference Study: Impact of Planned 138 kV CPP Line on Norfolk Southern Railway
R. Southey, J. Ma, N. Mitskevitch, Y. Yang, G. Berlin, W. Ruan, Z. Luo
SES report prepared for Norfolk Southern Railway (Atlanta, Georgia), October 1, 2010.
2010/10/01
214 Suncor Firebag Substation Grounding Study – Substation 71 with Ground Rods Removed
R. Southey, W. Ruan, S. Lefebvre
SES report prepared for URS – Washington Division, October 1, 2010.
2010/10/01
213 Suncor Firebag Substation Grounding Study – Substation 85 with Ground Rods Removed
R. Southey, W. Ruan, S. Lefebvre
SES report prepared for URS – Washington Division, September 29, 2010.
2010/09/29
212 Suncor Firebag Substation Grounding Study – Temporary Measures: Well Pads 99, 105, 107, 108
R. Southey, W. Ruan, S. Perez, S. Lefebvre, S. Tee
SES report prepared for URS – Washington Division, September 17, 2010.
2010/09/17
211 Suncor Firebag Substation Grounding Study – Substation 65 with Ground Rods Removed
R. Southey, W. Ruan
SES report prepared for URS – Washington Division, September 3, 2010.
2010/09/03
210 Suncor Firebag Substation Grounding Study – Well Pad Grounding
R. Southey, W. Ruan, S. Perez, S. Lefebvre, H. Pinheiro, S. Tee
SES report prepared for URS – Washington Division, July 31, 2010.
2010/07/31
209 Habshan-5 Utilities & Offsites : Main Earthing Study
F. Dawalibi, J. Ma, R. Southey
SES report prepared for Hyundai Engineering & Construction Co., Ltd. (Seoul, South Korea), July 27, 2010.
2010/07/27
208 Habshan-5 Utilities & Offsites : Solid vs. Resistance Earthing of 132 kV Source Transformers
F. Dawalibi, J. Ma, R. Southey
SES report prepared for Hyundai Engineering & Construction Co., Ltd. (Seoul, South Korea), July 20, 2010.
2010/07/20
207 Suncor Firebag Substation Grounding Study – Substation 29EDD-85 with Ground Well
R. Southey, J. Ma
SES report prepared for URS – Washington Division, February 25, 2010.
2010/02/25
206 Phase I – Preliminary Analysis of Electromagnetic Interference Caused by Lickville Substation Grounding System and 100 kV Transmission Line to an Adjacent Pipeline
F. Dawalibi, S. Tee, Y. Yang
SES report prepared for New Horizon Electric Cooperative and ELECT P.C. (South Carolina, U.S.A.), December 10, 2009.
2009/12/10
205 Phase II – Detailed Analysis of Electromagnetic Interference Caused by Lickville Substation Grounding System and 100 kV Transmission Line to an Adjacent Pipeline
F. Dawalibi, S. Tee
SES report prepared for New Horizon Electric Cooperative and ELECT P.C. (South Carolina, U.S.A.), March 13, 2010.
2010/03/13
204 Waterbury-Wallingford Yankee Gas Line Expansion Interference Study – Part II
F. Dawalibi, S. Tee, J. Liu, N. Mitskevitch, S. Lefebvre, L. Valcarel
SES report prepared for Yankee Gas Northeast Utilities System (Connecticut, USA), December 9, 2009.
2009/12/09
203 Yankee Gas EMI Study – Phase I (East Portion)
F. Dawalibi
SES report prepared for Yankee Gas Services Company (Connecticut, USA), October 28, 2009.
2009/10/28
202 Test Results: Equivalent Ground Impedance of 500 kV Line Shield Wires at Future Nobel SC Station Site
R. Southey
SES report prepared for ABB AB (Sweden), June 29, 2009.
2009/06/29
201 National Grid Underground Safety Analysis
F. Dawalibi, R. Southey, S. Tee, N. Mitskevitch
SES report prepared for National Grid (Massachusetts, USA), May 6, 2009.
2009/05/06
200 Overhead Load Break Switch Gradient Control Grid Analysis
R. Southey, W. Ruan
SES report prepared for National Grid (Massachusetts, USA), March 15, 2009.
2009/03/15
199 EWCC – EnWin – Ford Composite Grounding System Analysis – Phase II Report
J. Ma, R. Southey
SES report prepared for East Windsor Cogeneration Centre LP, February 26, 2009.
2009/02/26
198 Brayton Point Closed Loop Project Grounding Review
J. Ma
SES report prepared for Kiewit Power Engineers Co., February 20, 2009.
2009/02/20
197 Revised AC Interference Study for Change in Pipeline Installation Methods – BesiCorp Cogeneration Plant in Rensselaer, New York
R. Southey, W. Ruan
SES report prepared for LG Constructors, Inc., February 16, 2009.
2009/02/16
196 Suncor Firebag Substation Grounding Study
R. Southey, W. Ruan, J. Ma, S. Tee, Y. Yang, Z. Luo
SES report prepared for URS – Washington Division, January 30, 2009.
2009/01/30
195 Triad Heating System Analysis (Phase I)
F. Dawalibi, S. Fortin, J. Liu
SES report prepared for SEPCO, January 25, 2009.
2009/01/25
194 Suncor VUP Grounding Study – Final Report
F. Dawalibi, R. Southey, W. Ruan, J. Liu, S. Tee, S. Fortin, P. Zhao, S. Baron, Z. Luo
SES report prepared for Suncor Energy Inc., January 2009.
2009/01/06
193 EWCC - EnWin Composite Grounding Analysis
R. Southey, J. Ma, Y. Yang
SES report prepared for East Windsor Cogeneration Centre LP, November 27, 2008.
2008/11/27
192 El Dorado Solar Expansion Project Grounding Study
J. Ma, N. Mitskevitch
SES report prepared for First Solar Electric, LLC, November 21, 2008.
2008/11/21
191 EnWin Substation Grounding Analysis – Phase II Report
J. Ma, R. Southey
SES report prepared for Gryphon International Engineering Services Inc., October 9, 2008.
2008/10/09
190 Test Report – Duley Substation Ground Resistance Test
R. Southey
SES report prepared for Noble Environmental Power, Inc., October 5, 2008.
2008/10/05
189 Marble River Wind Farm – Clinton/Ellenburg 230 kV/34.5 kV Substation Grounding Analysis (Phase II)
F. Dawalibi, R. Southey, J. Liu, Z. Luo
SES report prepared for Marble River Wind Farm, September 2008.
2008/09/02
188 Suncor VUP Grounding Study
F. Dawalibi, R. Southey, W. Ruan, J. Liu, S. Tee, S. Fortin, P. Zhao, S. Baron, Z. Luo
SES Phase I report prepared for Suncor Energy Inc., August 2008.
2008/08/05
187 Technical Report – Altona Wind Park Turbine Grounding Design Study
R. Southey
SES report prepared for Noble Environmental Power, Inc., July 19, 2008.
2008/07/19
186 Test Report – Ellenburg and Clinton Wind Park Turbine Ground Resistances and Soil Resistivities
R. Southey
SES report prepared for Noble Environmental Power, Inc., July 17, 2008.
2008/07/17
185 Phase I Report for EnWin Substation Grounding Study
R. Southey, J. Ma
SES report prepared for Gryphon International Engineering Services Inc., June 27, 2008.
2008/06/27
184 Circulating Current Modeling in the Thorold Cogeneration Plant Grounding Study
J. Ma
SES report prepared for Kiewit Power Engineers Co., May 6, 2008.
2008/05/06
183 Phase II of AC Interference Study – BesiCorp Cogeneration Plant in Rensselaer, New York
R. Southey, W. Ruan
SES report prepared for LG Constructors, Inc., April 25, 2008.
2008/04/25
182 Marble River Wind Farm – Clinton/Ellenburg 230 kV/34.5 kV Substation Grounding Analysis (Phase I)
F. Dawalibi, R. Southey, J. Liu, Z. Luo
SES report prepared for Marble River Wind Farm, March 21, 2008.
2008/03/21
181 SaskPower Planned Pelican Narrows Substation
R. Southey, W. Ruan, S. Tee, N. Dawalibi
SES report prepared for SaskPower, March 20, 2008.
2008/03/20
180 PNGTS AC Mitigation Study – Phase I
R. Southey, W. Ruan
SES letter report prepared for PNGTS, September 2007.
2007/09/11
179 AC Mitigation Study on Derwa San Ramon Valley Recycled Water Pipeline, Final Report
R. Southey, F. Dawalibi, W. Ruan, S. Tee
SES report prepared for Derwa, July 2007.
2007/07/18
178 Review of: The Interference Study Entitled ‘CDEGS LFI Model Review’ carried out by Hydro Tasmania
F. P. Dawalibi and S. Tee
SES letter report prepared for Hydro Tasmania, July 2008.
2008/07/01
177 Mesa Pipeline Electromagnetic Interference Study
F. P. Dawalibi, R. D. Southey, N. Mitskevitch, S. Tee
SES Report prepared for RPS JDC Inc., July 2008.
2008/07/01
176 Middletown-Norwalk Electromagnetic Interference Study: Part 2
F. P. Dawalibi, J. Ma, R. Southey, J. Liu, N. Mitskevitch
SES Report prepared for Northeast Utilities & The United Illuminating Company, March 2008.
2008/03/01
175 Poste Mégantic Étude de mise à la terre,” SES Report prepared for Hydro-Québec
R. D. Southey, F. P. Dawalibi, W. Ruan, Z. Luo
SES Report prepared for Hydro-Québec, February 2008.
2008/02/01
174 AC Interference Study: NRI 345 kV Line / M&N Pipeline, Maine – New Brunswick, Phase 3
F. P. Dawalibi, R. D. Southey, W. Ruan, Y. Li, S. Fortin, S. Tee, J. Liu, Z. Luo
SES Report Prepared for Spectra Energy, January 2008.
2008/01/01
173 Lake Benton Telephone Lines: Analysis of Possible Interference from Planned 115 kV Transmission Line
J. Ma, R. D. Southey
SES Report prepared for Xcel Energy, November 2007.
2007/11/01
172 Computation of the Potential and Current Transferred to Customer Ground Rod during a Lightning Strike on a Distribution Line
F. P. Dawalibi and S. Fortin
SES Report prepared for Pacific Gas and Electric Company, August 2007.
2008/08/20
171 Herblet Lake Performance & Measurements Analysis
F. Dawalibi, R. Southey, J. Ma and S. Tee
SES Report Prepared for Manitoba Hydro, October 2007
2007/10/17
170 Paca & Orchard Substation Grounding Study
F. Dawalibi, J. Ma, R. Southey and J. Liu
SES Report prepared for Black & Veatch Corporation, October, 2007
2007/10/02
169 GMCW 345 kV Line NEV Study
R. Southey, F. Dawalibi, W. Ruan, N. Mitskevitch and Y. Li
SES Report prepared for American Transmission Company, September 2007
2007/09/04
168 Neutral to Remote Earth Voltage Analysis – North Randolph-Fox Lake-North Beaver Dam Transmission Line
R. Southey, F. Dawalibi, W. Ruan, Y. Yang and S. Tee
SES Report prepared for American Transmission Company, June, 2007
2007/04/17
167 Neutral to Remote Earth Voltage Analysis - Duplainville Transmission Line Project
F. Dawalibi, R. Southey, W. Ruan, S. Tee, Y. Li and N. Mitskevitch
SES Report prepared for American Transmission Company, April 2007
2007/04/10
166 Glenbrook-Nolwalk Electromagnetic Interference Study
F. Dawalibi, J. Ma, R. Southey, J. Liu and S. Fortin
SES Report prepared for Northeast Utilities Service Company, April, 2007
2007/04/03
165 Bethel-Norwalk Extended Electromagnetic Compatibility Analysis
F. P. Dawalibi, R. D. Southey, Y. Li
SES Report prepared for Northeast Utilities Service Company, December, 2006
2006/12/15
164 Middletown-Norwalk Electromagnetic Interference Study: Interim Report
F. Dawalibi, J. Ma, R. Southey, J, Liu, N. Mitskevitch
SES Report prepared for Northeast Utilities & The United Illuminating Company, November, 2006
2006/11/30
163 Neutral to Remote Earth Voltage Analysis Jefferson Transmission Line Project, Phase II
R.D. Southey, F. P. Dawalibi, W. Ruan, S. Tee, Y. Yang
SES Report prepared for American Transmission Company, November, 2006
2006/11/10
162 Computer Modeling of Induced Voltages on the Water Pipes along the Norwalk-Glenbrook 115 kV Underground Power Cables
J. Ma, R. D. Southey
SES Report prepared for Northeast Utilities Service Company, October, 2006
2006/09/22
161 Neutral to Remote Earth Voltage Analysis Jefferson Transmission Line Project, Phase I
F. P. Dawalibi, R. D. Southey, W. Ruan, Y. Li, S. Tee, N. Mitskevitch
SES Report prepared for American Transmission Company, September, 2006
2006/09/08
160 Benton Lake Telephone Lines Harmonic Interference Analysis
R. D. Southey and J. Ma
SES Report prepared for Xcel Energy, October, 2007
2006/10/03
159 Sinistre de Pointe du Lac Suite à la Destruction d’une Conduite de Gaz par Interférence Electromagnétique
F. P. Dawalibi, J. Liu
SES Report prepared for Gaz Metropolitan, July, 2006
2006/07/22
158 AC Mitigation Study on Derwa San Ramon Valley Recycled Water Pipeline, Phase 2
R.D. Southey, W. Ruan, Y. Li , S. Tee
SES Report prepared for Derwa, April, 2006
2006/04/21
157 Scoping Document for the Middletown to Norwalk Electromagnetic Interference Study
F. Dawalibi, J. Ma, R. Southey, J. Liu, N. Mitskevitch
SES Report prepared for Northeast Utilities & The United Illuminating Company, April, 2006
2006/04/07
156 AC Mitigation Study on Derwa San Ramon Valley Recycled Water Pipeline, Phase 1
R.D. Southey, F. Dawalibi, W. Ruan
SES Report prepared for Derwa, September 19, 2005
2005/09/19
155 Progress Energy FGT Loop G Florida Rock Review
R. D. Southey, W. Ruan, Y.Li
SES Report Prepared for Ark Engineering, July, 2005
2005/07/05
154 TLO-IdahoPacific-AT&T-Fault Incident Analysis
F. P. Dawalibi
SES Investigation Prepared for Towman Law Office, January 10, 2005
2005/01/10
153 McGuire AFB Grounding Study – Touch and Step Voltage Analysis
R. D. Southey, P. Zhao, W. Ruan, Y. Yang and N. Miskevitch
Project report prepared for O’Brien & Gere Engineers on February 15th, 2006.
2006/02/15
152 Analyse comparative de la performance de différentes topologies de prises de terre lors d’enclenchements de batteries de condensateur
F. P. Dawalibi, S. Tee, and S. Fortin
rapport préparé pour Hydro Québec, Décembre 2005.
2005/12/31
151 Point Lepreau Generating Station Zone of Influence Study
F. P. Dawalibi, J. Ma, R. Southey, and Y. Yang
Project report prepared for New Brunswick Transmission Corp. on December 22, 2005.
2005/12/22
150 Chases Lake Substation Grounding and EMC Measurements and Analysis
F.P. Dawalibi, J. Ma, R. Southey, J. Liu, S. Fortin, and N. Miskevitch
Project report prepared for Alliant Energy EPC LLC., November 30, 2005
2005/11/30
149 St. Leon Grounding Analysis
F.P. Dawalibi, J. Ma, S. Tee, and J. Liu
SES Report prepared for Manitoba Hydro, June 14, 2005
2005/06/14
148 NRI 345 kV Line / M&N Pipeline Maine - New Brunswick
F.P. Dawalibi, R. D. Southey, W. Ruan, Y. Li, S. Fortin and Deepak Mankar (Corrpro)
Project Report prepared by SES and Corrpro Companies Inc. for Duke Energy and Bangor Hydro, April 22, 2005
2005/04/22
147 Eastern Region Water Supply Facility Raw Water Main Orange County, Florida
R. D. Southey, W. Ruan, and N. Mitskevitch
SES Report prepared for Black and Veatch Corporation, January 31, 2005
2005/01/31
136 HVDC Substation Grounding Analysis
F. P. Dawalibi, J. Ma, Y. Li, Y. Yang
SES report prepared for Jiangsu EPRI, March 2004
2004/03/18
100 Ceredo Generating Station Grounding Study – Final Report
R. D. Southey, J. Ma
SES Report Prepared for AEP Pro Serv, Inc., April 12, 2001
2001/04/12
101 Elk Hills Power Project – Ground Fault Impact Analysis
R. D. Southey, J. Ma, N. Mitskevitch
SES Report Prepared for Merchant Power Engineers and Constructors, March 7, 2001 (Phase I) and April 23, 2001 (Phase II)
2001/04/23
102 Midlothian Power Plant Grounding Study
J. Ma, F. Dawalibi, R. D. Southey, J. Liu
SES Report Prepared for Alstom Power Inc., April 30, 2001
2001/04/30
103 Review of Diablo Canyon Dry Cask Facility Grounding Analysis
R. D. Southey, S. Fortin
SES Report Prepared for Pacific Gas & Electric Company, June 22, 2001
2001/06/22
104 Woodward Mountain Wind Ranch Electromagnetic Interference Study – Phase 1)
R. D. Southey, Y. Li
SES Report Prepared for Renewable Energy Systems Ltd., June 15, 2001 (Phase 1) and July 16, 2001 (Phase 2)
2001/06/15
105 Grounding Review for 69 kV Distribution Substation
R. D. Southey, J. Ma, W. Ruan
SES Report Prepared for Atlantic Fine Yarns, Inc., July 16, 2001
2001/07/16
106 Grounding Verification – El Paso Merchant Power Plant
R. D. Southey, J. Ma, J. Liu
SES Report Prepared for Kvaerner Process, July 17, 2001
2001/07/17
107 ANP Blackstone Power Plant – Updated Fence and Guard Rail Protection
R. D. Southey, W. Ruan
SES Report Prepared for Alstom Power Inc., July 23, 2001
2001/07/23
108 Conceptual Grounding Design for Pokemouche Plant 69 kV Substation
R. D. Southey, W. Ruan, J. Ma, N. Mitskevitch
SES Report Prepared for Atlantic Fine Yarns Inc., August 10, 2001
2001/08/10
109 Grounding Study of As-Built Grid of ANP Hays Power Plant
W. Ruan, R. D. Southey
SES Report Prepared for Alstom Power Inc., August 20, 2001
2001/08/20
110 Overhead Line/ Pipe Parallelism Interference Effects and Mitigation Measures
R. D. Southey, Y. Li
SES Report Prepared for Amran Establishment LLC, October 19, 2001
2001/10/19
111 ANP Blackstone Power Plant – Updated Fence and Guard Rail Protection, Revision 2
W. Ruan, R. D. Southey
SES Report Prepared for Alstom Power Inc., January 14, 2002
2002/01/14
112 Grounding Analysis – ANP Bellingham Power Plant
R. D. Southey, N. Mitskevitch
SES Report Prepared for Alstom Power Inc., January 24, 2002
2002/01/24
113 Border Substation Grounding Study
R. D. Southey, Y. Li
SES Report Prepared for Manitoba Hydro, March 25, 2002
2002/03/25
114 Needle Rod Transient Analysis
F. Dawalibi, S. Tee
SES Report Prepared for Occupational Safety & Research Institute, Korea, May 14, 2002
2002/05/14
115 Study of Temporary Grounding at FCWA Griffith WTP Site
R. D. Southey, N. Mitskevitch
SES Report Prepared for Black & Veatch Corporation, June 14, 2002
2002/06/14
116 Conceptual Grounding Design for ANP El Paso Power Plant
R. D. Southey, Y. Yang
SES Report Prepared for Alstom Power Inc., August 27, 2002
2002/08/27
117 Jeep Substation – 25 kV & 138 kV Interference Analysis
R. D. Southey, J. Ma, J. Liu
SES Report Prepared for SNC - Lavalin, August 29, 2002 (Phase 1) and October 4, 2002 (Phase 2)
2002/08/29
118 Mill Creek Generating Plant Grounding Analysis
F. Dawalibi, R. D. Southey, S. Tee, J. Liu
SES Report Prepared for Duke Energy Corporation, October 9, 2002
2002/10/09
119 Brandon Area Ground Grid & Soil Analysis
R. D. Southey, W. Ruan
SES Report Prepared for Manitoba Hydro, October 25, 2002
2002/10/25
120 Measurement and Mitigation of Touch Voltages at Elk Hills Power Plant
R. D. Southey
SES Report Prepared for Elk Hills Power, LLC, November 15, 2002
2002/11/15
121 Sullivan Plant Grounding Study
R. D. Southey, J. Ma
SES Report Prepared for Portland General Electric, January 23, 2003
2003/01/23
122 EMC Study: Indeck Niles Energy Project & Amtrak Railway
R. D. Southey, J. Ma, D. Dallaire, N. Mitskevitch
SES Report Prepared for Indeck – Niles, LLC, March 5, 2003
2003/03/05
123 J. H. Kerr Hydroelectric Plant Grounding Analysis
F. P. Dawalibi, R. D. Southey, S. Tee, J. Liu
SES Report Prepared for Overstreet Electric Co., March 11, 2003
2003/03/11
124 Engineering Study to Model 345 kV Circuit Involved in Flashover
R. D. Southey, J. Ma
SES Report Prepared for City Public Service of San Antonio, April 9, 2003
2003/04/09
125 Radisson Station Grounding Analysis
F. P. Dawalibi, R. D. Southey, Y. Li
SES report prepared for Manitoba Hydro, April 28, 2003
2003/04/28
126 Henday Station Grounding Analysis
F. P. Dawalibi, R. D. Southey, W. Ruan, S. Tee, J. Liu
SES report prepared for Manitoba Hydro, April 28, 2003
2003/04/28
127 Steel Casing Overheating Analysis
F. P. Dawalibi, J. Liu, S. Tee, Y. Yang
SES report prepared for Power Engineers, July 18, 2003
2003/07/18
128 Grounding Study – South West Quadrant Replacement Project – Contract No 141033
R. Southey, W. Ruan
SES report prepared for AMEC E&C Services Limited, September 18, 2003
2003/09/18
129 DongShanQiao Substation Grounding Analysis
F. P. Dawalibi, J. Ma, Y. Li, Y. Yang
SES report prepared for Jiangsu EPRI, October 2003
2003/10/01
130 Grounding Design – City of Phoenix UP01 Waste Water Treatment Plant Main Substation
R. Southey
SES report prepared for Malcolm Pirnie, Inc., October 6, 2003
2003/10/06
131 Sullivan Plant: Measurement of Voltages in Water During Simulated Fault Conditions
R. Southey
SES report prepared for Portland General Electric, October 14, 2003
2003/10/14
132 Estimation of Zero Sequence Current Flow in 345 kV Cross-Hudson Project Cables
R. Southey, W. Ruan
SES report prepared for PSEG Power LLC., December 5, 2003
2003/12/05
133 Soil Resistivity Testing Along Access Road to ANP-BEC Blackstone Power Plant
R. Southey, W. Ruan
SES report prepared for ANP Blackstone Energy Co. LLC., December 29, 2003
2003/12/29
134 Conceptual Grounding Design of Meadowridge Substation
R. Southey, W. Ruan and S. Tee
SES report prepared for Baltimore Gas & Electric Co., February 18, 2004
2004/02/18
135 AC Electrical Interference Analysis for the Gulfstream Line 500
R. Southey, Y.Li
SES report prepared for Florida Power Corporation – A progress Energy Co., March 3, 2004
2004/03/03
138 Grounding Verification Study for 72 kV Substation
R. Southey, W. Ruan, S. Tee
SES report prepared for AMEC E&C Services Limited, April 12, 2004
2004/04/12
137 Dorsey Station Grounding Analysis
F.Dawalibi, J.Ma, R.Southey, Y.Li
SES report prepared for Manitoba Hydro, April 29, 2004
2004/04/29
139 Technical Report – Computer Modeling for Kirkland Lake Grounding Study
R. Southey, J.Liu
SES report prepared for Gryphon International Engineering Services Inc., June 9, 2004
2004/06/09
141 Assurant Kingston Call Center – Grounding Design Review
F. Dawalibi
SES report prepared for Eaton Electrical Services & Systems, June 19, 2004
2004/06/19
140 Technical Report #2 - #3 – Computer Modeling of Counterpoise Added to Kirkland Lake Grounding Grid to Reduce Ground Resistance
R. Southey, J.Liu
SES report prepared for Gryphon International Engineering Services Inc., June 14, 2004.
2004/06/14
142 Review of Palomar Energy Substation Grounding Analysis
J. Ma
SES report prepared for San Diego Gas & Electric, September 7, 2004
2004/09/07
144 Grounding Design Guidelines: CNRL Horizon Oil Sands Project
R.Southey
SES report prepared for AMEC Americas Limited, September 7, 2004
2004/09/07
143 Grounding Study for Suncor 72 kV/7.2 kV Tailing Booster Pumphouse HV Substation
R. Southey, W. Ruan
SES report prepared for Stantec Consulting Ltd., September 13, 2004
2004/09/13
145 Atlantic-Delmar 60/115 kV Transmission Line Electromagnetic Compatibility Analysis
F. Dawalibi, R. Southey, J.Ma, Y.Li, S.Tee, J.Liu
SES report prepared for Pacific Gas & Electric, September 13, 2004
2004/09/13
146 Special Operating Procedure: Work at Substations G20, G21, G22 During Frozen Soil Conditions
R. Southey
SES report prepared for AMEC Americas Limited, October 7, 2004
2004/10/07
97 Border Station Grounding Study
R. D. Southey, N. Mitskevitch
SES Report Prepared for Teshmont Consultants Inc./Manitoba Hydro, January 22, 2001
2001/01/22
99 Earth Potential Transfer Study of ANP Blackstone Power Plant
R. D. Southey, W. Ruan,
SES Report Prepared for Alstom Power Inc., March 7, 2001.
2001/03/07
98 Brandon Combustion Turbine Grounding Model
R. D. Southey, N. Miskevitch,
SES Report Prepared for Teshmont Consultants Inc./Manitoba Hydro, March 1, 2001.
2001/03/01
96 Groton/Pfizer Safety Evaluation Study
F. Dawalibi,
SES Report Prepared for Consulting Engineers Group, Inc., December 15, 2000.
2000/12/15
95 Suncor Millennium Project - Area 86 Extraction Grounding Study
R. D. Southey, F. P. Dawalibi, Y. Li,
SES Report Prepared for SNC - LAVALIN Inc., November 6, 2000 (Phase 1), January 15, 2001 (Phase 2).
2000/01/15
94 Unbalance Study for Lockport-Lombard 345 kV and 138 kV Transmission Lines, Phase II
J. Ma, S. Fortin, F. P. Dawalibi, W. Ruan, R. D. Southey,
SES Report Prepared for Commonwealth Edison, November 1, 2000
2000/11/01
93 Project 1800, Division 6, Frederick P. Griffith, Jr. Water Treatment Plant - Grounding Study
R. D. Southey, F. P. Dawalibi, N. Miskevitch,
SES Report Prepared for Fairfax County Water Authority, October17,2000
2000/10/17
92 Tubular Steel Distribution Pole Study
R. D. Southey, F. P. Dawalibi, Y. Li, Y. Yang, W. Ruan,
SES Report Prepared for Southern California Edison Co., September 11, 2000.
2000/09/11
91 GPR Study of Northport Power Station (Phase 2)
F. P. Dawalibi, R. D. Southey, J. Ma, Y. Li,
SES Report Prepared for Keyspan Energy, August 3, 2000.
2000/08/03
90 Review of Grounding Design for La Paloma Power Plant
R. D. Southey, J. Ma, F. Dawalibi, W. Ruan, N. Miskevitch,
August 1, 2000.
2000/08/01
89 Review of Park Place Substation GPR Transfer Study
F. P. Dawalibi, R. D. Southey, Y. Li,
SES Report Prepared for Keyspan Energy, May 18, 2000 (Phase 1), June 5, 2000 (Phase 2).
2000/06/05
88 GPR Study of Northport Power Station
F. P. Dawalibi, R. D. Southey, Y. Li,
SES Report Prepared for Keyspan Energy, May 12, 2000 (Phase 1).
2000/05/12
87 Review of Grounding Design and Plans for Reinforcement of Existing Grounding Grid at Northwest Substation, TSS114
R. D. Southey,
SES Report Prepared for Commonwealth Edison, April 24, 2000.
2000/04/24
86 Mitigation Review for Mokelumne Aqueduct No. 3 Seismic Upgrade and Underpass Construction,
F. P. Dawalibi, R. D. Southey, W. Ruan,
SES Report Prepared for CH2M HILL, December 30, 1999.
1999/12/30
85 ANP Hays Power Plant Conceptual Grounding Study,
F. P. Dawalibi, R. D. Southey, W. Ruan,
SES Report Prepared for ABB Alstom Power, October 25, 1999.
1999/10/25
84 Safety Evaluation of Paiton Energy Unit 7&8 Grounding System,
F. P. Dawalibi, R. D. Southey, J. Ma,
SES Report Prepared for Paiton Energy, October 18, 1999.
1999/10/18
83 ANP Blackstone Power Plant Conceptual Grounding Study,
F. P. Dawalibi, R. D. Southey, J. Ma, Y. Yang,
SES Report Prepared for ABB Alstom Power, August 15, 1999.
1999/08/15
82 AC Mitigation Study - Town of Weir 10
F. P. Dawalibi, R. D. Southey, W. Ruan,
Natural Gas Pipeline - Final Report, SES Report Prepared for Neel-Schaffer, Inc., June 17, 1999
1999/06/17
81 Grounding and Mitigation Study of SCE Carson Substation/PPSI Meter Station,
F. P. Dawalibi, R. D. Southey, J. Ma, N. Miskevitch,
SES Report Prepared for Pacific Pipeline System, Inc., May 25, 1999.
1999/05/25
80 Pittsburg Power Plant Meter Station Grounding Analysis,
F. P. Dawalibi, R. D. Southey, J. Ma, W. Ruan, Y. Li,
SES Report Prepared for Pacific Gas and Electric Company, February 16, 1999.
1999/02/16
79 Town of Weir 10
F. P. Dawalibi, R. D. Southey, W. Ruan, Y. Li,
Natural Gas Pipeline - AC Interference Study, SES Report Prepared for Neel-Schaffer, Inc., January 5, 1999.
1999/01/05
78 PNGTS Pipeline AC Mitigation Modeling,
F. P. Dawalibi, J. Ma, W. Ruan, R. Southey, Y. Li,
SES Report Prepared for Bechtel Corporation, July 29, 1998.
1998/07/29
77 Mayakan Pipeline Project - Revised AC Voltage Mitigation,
F. P. Dawalibi, J. Ma, W. Ruan, R. Southey, Y. Li,
SES Report Prepared for TransCanada International, June 30, 1998.
1998/06/30
76 Yucatan Peninsula (Mayakan) Gas Pipeline Project: Computer Modeling of AC Interference Mitigation,
F. P. Dawalibi, J. Ma, W. Ruan, H. König, R. Southey, J. Goulet,
SES Report Prepared for Bechtel Corporation, April 2,1998
1998/04/02
75 Elmhurst Capacitor Fault Modeling and Analysis,
F. P. Dawalibi, J. Ma, R. D. Southey, W. Ruan, S. Fortin,
SES Report Prepared for Commonwealth Edison Company, January 1998.
1998/01/01
74 Determination of Ground Impedances of In-Service Distribution Substations: Goulds and Kenmount Substations,
F. P. Dawalibi, R. D. Southey, J. Goulet, H. König,
SES Report Prepared for Newfoundland Light& Power Company, December 1997.
1997/12/01
73 Safety Grounding Practices for Personnel Working on Distribution Systems Up to 50 kV,
F. P. Dawalibi, R. D. Southey, J. Goulet, P. W. Hotte,
SES Report Prepared for Canadian Electricity Association, CEA,December 1997
1997/12/01
72 AC Mitigation Design Study for Hawiyah Gas Development Projects,
F. P. Dawalibi, J. Ma, W. Ruan, R. D. Southey, J. Goulet,
SES Report Prepared for Gulf Interstate Engineering Company, July 1997.
1997/07/01
71 SCE&G Lyles Substation Grounding Study,
F. P. Dawalibi, J. Ma, W. Ruan, R. D. Southey,
SES Report Prepared for South Carolina Electric & Gas Co., June 1997.
1997/06/01
70 Analysis of MOV Failures at Skokie Substation,
F. P. Dawalibi, J. Ma, S. Fortin, R. D. Southey,
SES Report Prepared for Commonwealth Edison Co., November 1996.
1996/11/01
69 Namchoonchun Gas Insulated Substation Grounding Analysis,
F. P. Dawalibi, J. Ma, W. Ruan, R. D. Southey,
SES Report Prepared for Korea Power Engineering Co., Inc., November 1996.
1996/11/01
68 Analysis of Stress Voltages and GPR Levels During a Fault at the BAN 11 Site,
F. P. Dawalibi, J. Ma, R. D. Southey, S. Fortin,
SES Report Prepared for American Personal Communications, September 1996.
1996/09/01
67 Waugh Chapel Substation Grounding Study,
F. P. Dawalibi, R. D. Southey, J. Goulet,
SES Report Prepared for Baltimore Gas & Electric Company, June 1996.
1996/06/01
66 Mitigation Report - EWEB McKenzie Substation Grounding System Analysis,
F. P. Dawalibi, R. D. Southey, K. Bell, J. Goulet, J. Ma,
SES Report Prepared for Eugene Water & Electric Board, May 1996.
1996/05/01
65 Ville de Westmount, Mise à la terre du nouveau poste Sherbrooke - soutien à titre de conseiller expert pour mesures de la résistivité du sol,
R. D. Southey,
SES Report Prepared for City of Westmount, December 1995.
1995/12/01
64 Analysis of Electric Transients During Capacitor Switching at Skokie Substation,
F. P. Dawalibi, J. Ma, S. Fortin, W. Ruan,
SES Report Prepared for Commonwealth Edison Co., October 1995.
1995/10/01
63 AC Mitigation Study for 36
F. P. Dawalibi, R. D. Southey, J. Ma, J. Goulet,
Pipeline Near Khlong Mai and Nong Chock Substations, SES Report Prepared for IPCO - G&C Joint Venture, October 1995.
1995/10/01
62 Earth Potential Gradients at Three Tower/Pole Sites Near Columbia Gas Pipeline No. 10345,
F. P. Dawalibi, R. D. Southey, W. Xiong, J. Goulet,
SES Report Prepared for Columbia Gas Transmission Corporation, October 1995
1995/10/01
61 Modelling of Mitigation System Alternatives on Delmarva Pipeline at PECO Tower 12-5 Site,
F. P. Dawalibi, R. D. Southey, W. Xiong, J. Goulet,
SES Report Prepared for Columbia Gas Transmission Corporation, April 1995.
1995/04/01
60 Safety Grounding Practices for Personnel Working on Distribution Systems up to 50 kV - Phase II: Computer Modelling and Parametric Analysis,
F. P. Dawalibi, J. Goulet, R. D. Southey,
Interim Report, CanadianElectricalAssociation (CEA) Research Project 101 D 876, January 1995.
1995/01/01
59 AC Interference Study for 4 Metre PCC Pipe Near 220 kV Transmission Line,
F. P. Dawalibi, R. D. Southey, J. Goulet,
SES Report Prepared for Great Man-Made River Authority, November 1994.
1994/11/01
58 Equipotential Bonding Modelling,
F. P. Dawalibi, R. D. Southey,
SES Report Prepared for TransAlta Utilities Corporation, September 1994.
1994/09/01
57 Mitigation Design Study: Lenape Substation Interference,
F. P. Dawalibi, R. D. Southey,
SES Report Prepared for Columbia Gas Transmission Corporation, August 1994.
1994/08/01
56 Seaholm Electric Substation Grounding Study, Final Report,
F. P. Dawalibi, J. Ma, W. Xiong, S. Dawalibi,
SES Report Prepared for City of Austin, Texas, June 1994.
1994/06/01
55 Grounding Grid Performance During Lightning Discharges,
F. P. Dawalibi,
SES Report Prepared for Canadian Electrical Association, April 1994.
1994/04/01
54 Lenape Substation AC Interference Analysis,
F. P. Dawalibi, J. Goulet, J. Ma, R. D. Southey, W. Xiong,
SES Report Prepared for Philadelphia Electric Company, January 1994.
1994/01/01
53 AC Interference/Mitigation Studies: Key Tasks & Analysis Considerations,
F. P. Dawalibi, R. D. Southey,
SES Report Prepared for Florida Power Corporation, November 1993.
1993/11/01
52 Formulation of Pipeline Collocation Guidelines,
K. Bell, F. P. Dawalibi, R. D. Southey,
SES Report Prepared for Florida Power Corporation, October 1993.
1993/10/01
51 Étude de la Mise à la Terre du Complexe Hydro-Électrique Les Cèdres,
F. P. Dawalibi, E. Renald, R. D. Southey,
Joint SES/Tremcour Report Prepared for Hydro-Québec, October 1993.
1993/10/01
50 Pine Hill Grounding Study: Preliminary Report,
F. P. Dawalibi,
Joint SES/Tremcour Report Prepared for Bell Canada, September 1993.
1993/09/01
49 Point Lepreau Grounding Interference Problems,
F. P. Dawalibi,
SES Report Prepared for New Brunswick Power, July 1993.
1993/07/01
48 Calculation of Impedances and Fault Current Distribution in Transformer Ground Return Paths,
F. P. Dawalibi, R. D. Southey,
SES Report Prepared for Northern Telecom, June 1993.
1993/06/01
47 AC Interference Study: Los Vaqueros Relocation Project,
F. P. Dawalibi, J. Goulet, J. Ma, R. D. Southey, W. Xiong, M. Ly,
SES Report Prepared for Pacific Gas and Electric Company, May 1993.
1993/05/01
46 ARAMCO/SCECO 380 KV Interference Study: Phase III of Extended Study,
F. P. Dawalibi, J. Goulet, J. Ma, A. Selby, R. D. Southey, W. Xiong,
SES Report Prepared for ARAMCO Services Company and Saudi Consolidated ElectricCompany (Eastern), May 1993.
1993/05/01
45 Seaholm Electric Substation Grounding: Initial Study,
F. P. Dawalibi, R. D. Southey,
SES Report Prepared for City of Austin Electric Utility Department, April 1993.
1993/04/01
44 Analysis of Effects of WAPA 500 kV Transmission Line on EBMUD Mokelumne Aqueducts: Phase II Study,
F. P. Dawalibi, F. Donoso, J. Goulet, J. Ma, A. Selby, R. D. Southey, W. Xiong,
SES Report Prepared forEastBay MunicipalUtility District, April 1993.
1993/04/01
43 Delmarva 16
F. P. Dawalibi, F. Donoso, J. Goulet, J. Ma, R. D. Southey, W. Xiong,
SES Report Prepared for Texas Eastern Gas Pipeline Company, January 1993.
1993/01/01
42 Analysis of Fault Current Distribution in a Power System Network,
J. Ma,
SES Internal Report, January 1993.
1993/01/01
41 Analysis of Effects of WAPA 500 kV Transmission Line on EBMUD Mokelumne Aqueducts,
F. P. Dawalibi, F. Donoso, J. Ma, A. Selby, R. D. Southey, W. Xiong,
SES Report Prepared for East Bay Municipal UtilityDistrict, November1992
1992/11/01
40 Analysis of Grounding System Interconnections at PEPCO Generating Stations,
F. P. Dawalibi, J. Ma,
SES Report Prepared for Potomac Electric Power Company, November 1992.
1992/11/01
39 Analysis of Grounding Systems in Soils with Hemispherical Layering,
F. P. Dawalibi, J. Ma,
SES Report Prepared for Florida Power & Light Co., September 1992.
1992/09/01
38 Calculation of Potential in a Multilayer Soil of Unequal Thicknesses,
J. Ma,
SES Internal Report, August 1992.
1992/08/01
37 Monroe Street Power Plant Grounding Study,
F. P. Dawalibi, R. D. Southey, F. Donoso,
SES Report Prepared for Washington Water Power Company, July 1992.
1992/07/01
36 Exton Bypass Conductive Interference Study,
F. P. Dawalibi, R. D. Southey, F. Donoso,
SES Report Prepared for Texas Eastern Gas Pipeline Company, May 1992.
1992/05/01
35 Current Determination Algorithms,
A. M. Selby,
Internal SES Publication, December 1991.
1991/12/01
34 Brayton Point Lateral Pipeline Interference Mitigation Study,
F. P. Dawalibi, J. Goulet, J. Ma, R. D. Southey, W. Xiong,
SES Report Prepared for Algonquin Gas Transmission Company, November 1991.
1991/11/01
33 Electromagnetic and Conductive Interference Analysis - Engineering Applications Manual,
F. P. Dawalibi, J. Goulet, J. Ma, R. D. Southey, W. Tavcar,
SES Report Prepared for ARAMCO Services Company and Saudi ConsolidatedElectric Company (Eastern), October 1991.
1991/10/01
32 Electromagnetic and Conductive Interference Analysis - Mitigation Manual,
F. P. Dawalibi, M. Al-Khan, M. Al-Mulhim, J. Ma, R. D. Southey,
SES Report Prepared for ARAMCO Services Company and Saudi Consolidated ElectricCompany (Eastern), October 1991.
1991/10/01
31 ARAMCO/SCECO 380 KV Interference Study: Phase III of Extended Study,
F. P. Dawalibi, M. Al-Khan, M. Al-Mulhim, J. Ma, R. D. Southey,
SES Report Prepared for ARAMCO Services Company and Saudi ConsolidatedElectric Company(Eastern), October 1991.
1991/10/01
30 Empire State Pipeline Interference Study at RG&E Meter Station,
F. P. Dawalibi, J. Ma, R. D. Southey,
SES Letter Report Prepared for ANR Pipeline Company, September, 1991.
1991/09/01
29 Empire State Pipeline Interference Study of NYMO Parallelisms,
F. P. Dawalibi, J. Ma, R. D. Southey,
SES Letter Report Prepared for ANR Pipeline Company, September, 1991.
1991/09/01
28 Interference Study: High Voltage Power Line Crossings Along Empire State Pipeline,
F. P. Dawalibi, R. D. Southey, J. Ma, W. Xiong,
SES Report Prepared for ANR Pipeline Company, July 1991.
1991/07/01
27 Anitec HP Gas Feed Electrical Interference Study,
F. P. Dawalibi, P. J. Lagace, R. D. Southey,
SES Report Prepared for New York State Electric & Gas Corporation, July 1991.
1991/07/01
26 ARAMCO/SCECO 380 KV Interference Study: Phase II Update,
F. P. Dawalibi, M. Al-Khan, M. Al-Mulhim, R.D. Southey,
SES Report Prepared for ARAMCO Services Company and Saudi Consolidated Electric Company (Eastern), June1991.
1991/06/01
25 Hanover Loop Pipeline Voltage Mitigation Analysis,
F. P. Dawalibi, R. D. Southey,
SES Report Prepared for Texas Eastern Gas Pipeline Company, March 1991.
1991/03/01
24 Pipeline Interference Mitigation Study for Project 1004.1, Edgar Lateral,
F. P. Dawalibi, R. D. Southey,
SES Letter Report Prepared for Algonquin Gas Transmission Company, March 1991.
1991/03/01
23 Empire State Pipeline Voltage Mitigation Analysis,
F. P. Dawalibi, R. D. Southey,
Updated SES Report Prepared for ANR Pipeline Company, March 1991.
1991/03/01
22 WyCal Pipeline Voltage Mitigation Analysis,
F. P. Dawalibi, R. D. Southey, J. Goulet,
SES Report Prepared for Wyoming - California Pipeline Company, January 1991.
1991/01/01
21 Andytown Substation Capacitor Bank Study,
F. P. Dawalibi, W. Xiong,
Engineering Study Performed for Florida Power & Light Company, November-December 1990.
1990/12/01
20 IPL Bethune Station Grounding Study,
F. P. Dawalibi, R. D. Southey,
SES Report Prepared for SNC Consultants Ltd., November 1990.
1990/11/01
19 Empire State Pipeline Voltage Mitigation Analysis,
F. P. Dawalibi, R. D. Southey,
SES Report Prepared for ANR Pipeline Company, January 1990.
1990/01/01
18 Single Point Grounding Manual - Transmission Section,
F. P. Dawalibi, R. D. Southey,
SES Report Prepared for Pacific Gas & Electric, January 1990.
1990/01/01
17 Clearances for Swimming Pools Installed in Close Proximity to Utility Underground and Overhead Electrical Conductors (Low and High Voltage),
F. P. Dawalibi, R. D. Southey,
Canadian Electrical Association(CEA) ResearchReport 720-U-665, November 1989.
1989/11/01
16 Memphis Light & Gas Voltage Mitigation Analysis,
F. P. Dawalibi, R. D. Southey,
SES Report Prepared for Panhandle Eastern Pipeline Company, October 1989.
1989/10/01
15 Turkey Point Nuclear Power Plant Lightning Interference Study,
F. P. Dawalibi, R. D. Southey,
SES Report Prepared For Florida Power and Light Company, May 1989.
1989/05/01
14 Simplified Rules For Grounding Customer-Owned High Voltage Substations,
F. P. Dawalibi, R. D. Southey,
Canadian Electrical Association (CEA) Research Report 249-D-541, April 1989.
1989/04/01
13 Computerized Grounding Analysis of Customer-Owned High Voltage Substations: AUTOGRID User's Manual,
F. P. Dawalibi, R. D. Southey,
Canadian Electrical Association (CEA) Research Report 249-D-541, April 1989
1989/04/01
12 Phase II: ARAMCO/SCECO 380 kV Power Lines Interference Effects on Pipelines and Communications Lines,
F. P. Dawalibi, R. D. Southey,
SES Technical Report, February 1989.
1989/02/01
11 ARAMCO/SCECO 380 kV Power Lines Interference Effects on Pipelines and Communications Lines,
F. P. Dawalibi, R. D. Southey,
SES Technical Report, July 1988.
1988/07/01
10 Distribution System Grounding Practices,
F. P. Dawalibi, R. D. Southey,
Canadian Electrical Association (CEA) Research Report 249-D-540, November 1987.
1987/11/01
9 Power Line Fault Current Coupling to Nearby Natural Gas Pipelines - User's Guide for Computer Program ECCAPP,
F. P. Dawalibi, R. D. Southey,
Vol. 2, EPRI/A.G.A. Project RP742-4/PR-176-510, June 1987.
1987/06/01
8 Power Line Fault Current Coupling to Nearby Natural Gas Pipelines - Analytical Methods and Graphical Techniques,
F. P. Dawalibi, R. D. Southey,
Vol. 1, EPRI/A.G.A. Project RP742-4/PR-176-510, June 1987.
1987/06/01
7 Effectiveness of Station Grounding and Surface Detection of Damaged Ground Conductors,
F. P. Dawalibi,
Canadian Electrical Association (CEA) Report 019-T-218, February 1984.
1984/02/01
6 Interférence Téléphonique Causée par le Réseau de Distribution Électrique,
F. P. Dawalibi,
SES Report No. 399-07, February 1983.
1983/02/01
5 Power System Proximity Effects on Trans-Quebec & Maritimes Gas Pipeline in the Trois-Rivières Area,
F. P. Dawalibi,
SES Report No. 399-08, February 1983.
1983/02/01
4 Transmission Line Grounding,
F. P. Dawalibi,
EPRI Report, Project 1494-1, Vol. 1 and 2, August 1982 (book).
1982/08/01
3 Etude de l'Alimentation Electrique du Réseau Express de Montréal; Ligne Montréal-Mirabel,
F. P. Dawalibi et al.,
Report 5640-02-2-77, Canatrans Inc., Volumes 1 and 2, April 1977.
1997/04/01
2 Etude Théorique et Comparaison Expérimentale des Moteur Linéaires à Induction Compensés,
F. P. Dawalibi et al.,
Rapport CDT TP-847, Project No. 5047, Prepared for Transport Canada (MAS 02SU T8200-4-4503), 1976
1976/01/01
1 Avancement des Recherches Sur L'étude des Performances du Moteur Linéaire à Induction,
F. P. Dawalibi, N. Rivest,
Report CDT P-199, Project No. 4503, Prepared for Transport Canada (MAS 02SU T8200-4-4503), July 1975.
1975/07/01