Base de connaissances et FAQ 
                    
                    
                Base de connaissances et FAQ
| Question | Dernière modification | |
|---|---|---|
| 
										
											
												1
												 answer  | 
									
										Improving the computation time in Right-of-Way
										 Dernière modification: févr. 04, 2005 Computation time, ROW  | 
									2005/02/04 | 
| 
										
											
												1
												 answer  | 
									
										Modeling a dummy conductor but not a dummy phase
										 Dernière modification: févr. 04, 2005 dummy conductor, dummy phase  | 
									2005/02/04 | 
| 
										
											
												1
												 answer  | 
									
										Modeling a moving train in Right-of-Way
										 Dernière modification: févr. 07, 2005 rail-to-rail, train, insulating joints, GPR  | 
									2005/02/07 | 
| 
										
											
												1
												 answer  | 
									
										Using Monitor Fault module for a system without neutral wires
										 Dernière modification: févr. 07, 2005 Monitor Fault, neutral wires  | 
									2005/02/07 | 
| 
										
											
												1
												 answer  | 
									
										Using uniform soil model versus two-layer soil model in Right-of-Way
										 Dernière modification: févr. 07, 2005 uniform soil, two-layer soil, model  | 
									2005/02/07 | 
| 
										
											
												1
												 answer  | 
									
										Computing the pipeline coating stress voltage
										 Dernière modification: févr. 07, 2005 coating stress voltage, pipeline, GPR, coating resistance  | 
									2005/02/07 | 
| 
										
											
												1
												 answer  | 
									
										Modeling ballast as a coating in MALZ
										 Dernière modification: févr. 07, 2005 ballast, rail, coating resistivity  | 
									2005/02/07 |